Near Technopark Phase 4, Pallippuram, Trivandrum.

Project Status : Ongoing

LAND OWNED BY SFS

Permit Number : BP- 138/16-17

Size Range : 1545 - 979 sq.ft

3 & 2 Bedroom Apartments

RERA Reg : K - RERA/PRJ/TVM/056/2021

LAND OWNED BY SFS

Download Application Talk WIth Us

SFS ORCHARD - 2 & 3 BHK Apartments near Technocity, Pallippuram, Trivandrum

To Achieving Your Dreams
The young have dreams. It's what drives them to achieve their goals. A dream home is a priority for every young family and finding one near their work is what they desire most. SFS Orchard with 2 & 3 bedroom apartments tailor-made for the next generation of high achievers is coming up very near to the Technocity. Life Sciences Park and Kinfra.

A host of national and international companies have started functioning or are in various stages of commencement, creating job opportunities by their thousands at this location. For those pursuing careers in the IT/Biotech sectors, a home in SFS Orchard would be the perfect launch pad for a successful career.

POST YOUR ENQUIRY

COMMON AMENITIES


Fitness Centre

Children's Play Area

Terrace
Party Area

Driver's/Maid's
Room and Toilets

Indoor Shuttle
Court/Recreation Hall

Solar Power
for Common Areas

Solid Waste Management
(BIOBIN)

Swimming Pool

Furnished Main Lobby

TV Lounge

Kids'Pool

Motion Sensors
for Car Lighting

Jogging Track

Terrace Yoga/
Meditation Deck

Convenience Store
Provision

Common Ironing
Space

Two Wheeler Parking
& Bicycle Bay

Car Wash Facility

Rock Climbing
Provision for Kids

Library/Reading
Room for Kids

Cycle Path
for Kids

Toddler's Room
(Indoor)

BUILDING SPECIFICATIONS

Structure

Frame : RCC framed structure compliant with Seismic Zone-3 design.
Walls : Concrete block / brick masonry/ dry wall for interior partition.

Flooring

General : Vitrified tiles.
Toilets : Vitrified / Ceramic tiles.
Balconies : Vitrified / Ceramic Matte Finish Tiles.

Toilet Finishes

Wall : Ceramic / Vitrified Tiles.
Exhaust fan : In all Toilets and Kitchen.
Water Heater : Wired Water Heater provision in all Toilets.

Kitchen

Counter : Granite.
Sink : Stainless steel single bowl with drain board.
Sink in Work Area : Stainless Steel Single Deep Bowl Sink.

Doors

Entrance door : Hardwood Frame and Engineered Wood Shutter with Architrave.
Internal door : Hardwood Frame and Engineered Wood Shutter.
Toilet door : ABS Door Frame and Shutter.
Balcony door : Powder coated aluminium with Toughened Glass fixed / Sliding Shutters.
Windows : Powder Coated Aluminium with Glazed Shutters.

Grills & Railings

Window’s : MS Safety Grills.
Balcony railing : MS Hand Rails.

Electrical

General : Concealed wiring with PVC insulated copper cables and modular type switches. Adequate fan and light points, 6/16 amps power plugs controlled by MCB with RCCB protection. Independent energy meter for each apartment.
Wires : Fire Retardant Low Smoke Cables ( FRLS ).
Lifts & all common area : Generator back-up.

Power back up

Apartments : 1500 watts in each apartment.

Painting

Internal : Acrylic Emulsion over putty finish.
External : Exterior Emulsion.

Plumbing & Sanitary

EWC : Wall hung EWC with concealed Water Cistern.
Washbasin : Ceramic.
Taps and fittings : Chromium plated fittings and fixtures.

Water supply

Water supply through underground sump and overhead tank. Independent water meter for each apartment at an extra cost.

Air conditioning

Wired split a/c provision in all bedrooms and dummy provision in living/dining room.

Elevators

3 Fully Automatic Lifts.

Security System

Access control entry to lobby and from car parking areas.

Fire Fighting

Fire fighting arrangements as per Kerala Fire and Rescue Department norms.

Car park

For all apartment at an extra cost. Individual electric charge provision at extra cost.

Gas Connection

Reticulated Gas Connection in all apartments subject to Govt. rules at extra cost.

WORK STATUS

Download Project Status Report



PROJECT COMPLETION DATE - OCTOBER 2025

LOCATION MAP