Opp. Golf Course, Kowdiar.

Project Status : Ongoing Project

LAND OWNED BY SFS

Permit Number : E5/BA/710429/18 & E5/7565/19

Size Range : 3812 - 1906 sq.ft

5, 4 & 3 Bedroom Apartments

RERA Reg : K - RERA/PRJ/001/2020

LAND OWNED BY SFS

Download Application Talk WIth Us

SFS RETREAT - Luxury Apartments in Kowdiar, Trivandrum

Presenting SFS Retreat, one-of-a-kind residences where the greens are unlimited, the golf is exciting and where the royals have resided for close to a century. This signature lifestyle Apartments in Kowdiar, Trivandrum by SFS will be the piece de resistance of luxury living in Trivandrum and is coming up right across the Golf Course and Kowdiar Palace.

Kowdiar in Trivandrum is one of the most aristocratic and prestigious addresses in the state.Today, it is pulsting blend of tradition and modernity, with the best of shopping, entertainment, cuisine and sport available around here.

The 5, 4 and 3 bedroom extra-large Apartments at SFS Retreat will set new standards of luxury for its remarkable location, innovative and cutting-edge architecture by Hometech, Trivandrum and the lush green landscaped environment designed by Terra Firma, Bangalore. The designers of Luxury Apartments - SFS Retreat have given meticulous attention to the minutest details to create a remarkable sanctuary of space and happiness.

POST YOUR ENQUIRY

COMMON AMENITIES

Individual Water Meter
for each apartment

Taller and wider
entrance door

Pre-conduit Home Theatre
compatible wiring

Foot Lamp in bedroom
and passage

Fire Extinguisher DCP type
in kitchen

Built-in Mini Locker
in each flat

Braille Coded Control
in elevator

Magnetic Door
Stopper

Light Motion
Sensors

Metered Piped Gas Facility
for kitchen

BUILDING SPECIFICATIONS

STRUCTURE

RCC Framed structure. Cement hollow block/brick for walls wherever needed.

FLOORING

General floor including bedrooms – Vitrified tiles
Kitchen/Toilets/Balcony – Ceramic tiles

DOORS

Entrance door – Engineered wood door frame with shutter
Internal door – Engineered wood door frame with shutter
Toilet door – Laminate/ABS door
Balcony – UPVC sections with sliding/openable glass door and bug mesh

WINDOWS AND VENTILATORS

UPVC sections with a combination of fixed/sliding/openable glass panels and mosquito/bug mesh.

FINISHES

Internal walls and ceiling – Acrylic emulsion on cement plastered walls.
Toilet walls – Combination of vitrified/ceramic tiles, mirror and decorative paint, shower full glass partition in master bedroom toilet and 90 cms wide fixed glass partition in other bedroom toilets. Maid's toilet wall 150 cms height tiling.
Toilet ceiling – Suspended false ceiling.
Kitchen – Acrylic emulsion on cement plastered wall. Electrical and plumbing provisions without counters.

GRILLS & RAILS

Window safety grill – Grills of mild steel with enamel painted finish
Balcony railing – Railings with a combination of masonry parapet/MS/SS grill/glass

PLUMBING & SANITARY

Bedroom toilets – Wall hung EWC, concealed water cistern dual flush, counter type wash basin.
Maid's toilet - Floor mounted EWC and wall mounted wash basin

FAUCETS

Toilets - Chromium plated bathroom faucets.

ELECTRICAL

General – Sufficient number of electrical points with modular switches, independent energy meter for each apartment.

Generator back-up – Generator power back-up for lifts, pumps and common area lighting and up to 2500 Watts for each apartment

Television/Cable TV – Provision for Television in living, kitchen and all bedrooms.

Broadband connectivity – Conduit provision in living/dining and master bedroom.

Air conditioning – Provision to fit split air conditioners in living, dining, kitchen and all bedrooms.

WATER SUPPLY

Sump and overhead tank – Provision for water storage through underground sumps and overhead tanks Individual water metering for each apartment

ELEVATORS

Lobby levels – 3 Lifts of suitable passenger carrying capacity will be provided.

FIRE FIGHTING

Systems - Firefighting arrangements as per Kerala Fire and Rescue department norms

WORK STATUS

Download Project Status Report



PROJECT COMPLETION DATE - OCTOBER 2023

LOCATION MAP